

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 65 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The Eagle Gasket and Packing 1634 is a 4-drum modular spill platform unit designed to contain hazardous material leaks and spills at the drum storage or staging point. The platform provides a stable, compliant base for up to four standard drums, capturing incidental leaks before they reach the floor or surrounding environment. This type of secondary containment equipment is standard in facilities handling flammable liquids, corrosives, or other regulated materials. Industrial maintenance technicians, safety coordinators, and facility managers typically specify and install these units in warehouses, chemical storage areas, and maintenance shops.
The 1634 modular platform is suited for facilities that need scalable secondary containment. The modular design allows units to be connected or arranged to accommodate larger drum storage configurations without requiring a permanent built-in containment structure. Typical applications include drum staging areas in industrial plants, fleet maintenance facilities, and any site subject to EPA or OSHA secondary containment requirements for hazardous materials storage.
Designed as an OEM-style replacement or direct-use secondary containment platform compatible with standard industrial drum storage setups requiring hazardous material spill control.
Facility maintenance personnel or safety staff typically position spill platforms on flat, level surfaces before placing drums. No special tools are required for basic setup, but ensure the floor load rating accommodates the combined weight of the platform, drums, and contents. Follow applicable EPA 40 CFR and OSHA 29 CFR 1910.119 secondary containment guidelines for your specific materials. Inspect the platform periodically for cracks, warping, or contamination buildup that could compromise containment integrity.
Thanks for subscribing!
This email has been registered!