

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The Charlotte Pipe PVC 08300 1800HA is a Schedule 80 PVC 90-degree elbow designed for slip-to-slip connections in pressure piping systems. Manufactured in gray PVC, this fitting handles the demanding requirements of industrial, commercial, and residential plumbing applications where heavier wall thickness is required. Schedule 80 construction provides a thicker wall than Schedule 40, giving the fitting greater pressure ratings and improved resistance to mechanical stress. Plumbers and pipefitters install this elbow to redirect flow at a 90-degree angle within a run of 1-1/2-inch PVC pipe. The slip-style sockets accept standard 1-1/2-inch pipe ends for solvent-cement joining.
This elbow is suited for cold and hot water supply, chemical drainage, irrigation, and industrial process piping where Schedule 80 PVC is specified. The gray color is consistent with Schedule 80 PVC systems, making it easy to distinguish from Schedule 40 fittings on the job. It arrives in package quantities of 15 units, making it practical for contractors stocking common fittings for multiple-fixture rough-ins or system repairs. The universal part reference 806-015 may aid cross-referencing with other suppliers or legacy job specifications.
Designed as an OEM-style replacement and standard fitting for Schedule 80 PVC piping systems using 1-1/2-inch nominal pipe with slip-socket connections. Universal part reference 806-015 may assist in cross-referencing equivalent fittings across suppliers.
Installation should be performed by a licensed plumber in accordance with applicable IPC or local plumbing code requirements. Shut off the water supply and depressurize the line before cutting into any existing piping. Use an appropriate PVC primer and Schedule 80-rated solvent cement — do not substitute Schedule 40 cement where Schedule 80 is required by the system design. Allow full cure time before restoring system pressure.
Thanks for subscribing!
This email has been registered!