

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 74 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LZO8WSLK is a wall-mounted bottle filling station designed for filtered, chilled water delivery in high-traffic indoor environments. It operates with a hands-free sensor activation system and delivers chilled water at a rated capacity of 8.0 gallons per hour (GPH). A built-in 3,000-gallon certified filter reduces lead, particulates, chlorine, and taste and odor contaminants. An LED filter monitor provides a clear visual indicator when filter replacement is due. Laminar flow technology controls the water stream for clean, splash-free fills. The unit features a hermetically sealed refrigeration system and a real drain configuration to eliminate standing water. Licensed plumbers or qualified mechanical contractors typically perform installation.
The LZO8WSLK is suited for schools, office buildings, gyms, and other public or commercial indoor spaces requiring a permanent, ADA-compatible hydration point. The station supports single-station operation and mounts to a standard wall. It can be configured for high-left/low-right or reversed orientations to accommodate different layout requirements. Antimicrobial protection is integrated into key internal components to inhibit mold and mildew growth. A Green Ticker display tracks the cumulative number of 20-ounce single-use plastic bottles displaced, supporting sustainability tracking in institutional settings.
Designed as an OEM-style wall-mount bottle filling station for standard plumbing rough-in connections in residential or commercial indoor installations.
Installation should be performed by a licensed plumber in accordance with applicable local plumbing codes and IPC requirements. Shut off the water supply to the feed line before beginning any connection work. The unit requires a dedicated drain line; verify drain configuration before mounting. Do not energize the refrigeration system until all plumbing connections are complete and leak-checked.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!