

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 104 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LMABFTL8WSLK is a bi-level, wall-mounted bottle filling station and ADA-compliant drinking water cooler combined into a single unit. It delivers chilled, filtered water at a chilling capacity of 8.0 gallons per hour with a flow rate of 1.1 GPM using laminar flow technology to minimize splash. Touchless sensor activation eliminates contact at the fill point. A visual LED filter monitor signals when a filter replacement is due. The unit incorporates silver ion antimicrobial protection on key internal components to inhibit mold and mildew growth. Licensed plumbers and facility maintenance technicians handle installation in commercial and institutional environments.
This station is designed for high-traffic indoor installations including schools, gyms, offices, and public facilities. The bi-level configuration serves both standing users and individuals in wheelchairs, meeting ADA accessibility requirements. The integrated Real Drain system eliminates standing water in the basin, reducing sanitation concerns in busy locations. A Green Ticker display tracks the cumulative number of 20 oz. single-use plastic bottles displaced by the unit, supporting sustainability reporting for facility managers. The Flexi-Guard Safety Bubbler provides a flexible mouth guard at the drinking fountain portion of the unit.
Designed as a standalone wall-mounted or recessed bi-level bottle filling station and ADA cooler for indoor commercial, institutional, and public-facility plumbing systems. No specific model cross-compatibility data was provided by the manufacturer for this SKU.
Installation requires a licensed plumber to connect the unit to a cold water supply line and an appropriate drain. Shut off the water supply to the work area before beginning any connections. Electrical connection for the chilling and sensor components should be performed in accordance with applicable NEC requirements. Verify wall blocking or backing is adequate to support the unit weight before mounting.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!