

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 248 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LK4430FRKBLK is a tri-level freestanding outdoor drinking fountain built for high-traffic public environments. It provides three independent drinking stations at varying heights, accommodating users of all ages and physical abilities without requiring any electrical connection. The fountain features a Type 316 stainless steel base, powder-coated exterior in black, and heavy-gauge construction with tamper-resistant screws to resist vandalism and corrosion. A sealed, freeze-resistant internal system keeps fresh water separate from drain water and protects against groundwater contamination in cold-weather climates. Licensed plumbers and facilities maintenance professionals handle installation and connection to a pressurized supply line.
This fountain is designed for permanent outdoor installation in parks, recreational areas, school grounds, transit hubs, and similar public spaces. The freestanding floor-mount design anchors directly to a concrete or solid surface pad, making placement flexible where a pressurized water supply and drain connection are accessible. No electrical rough-in is required. The mechanical front-push bubbler activation on each station keeps operation straightforward for all users. Chrome-plated integral hood guards on the vandal-resistant bubblers reduce contamination from airborne deposits. The lead-free water supply path is certified to NSF 372, meeting health and safety requirements for potable water contact.
Designed as a freestanding floor-mount outdoor drinking fountain for connection to a standard pressurized potable water supply line and gravity drain. Consult local plumbing codes for supply pressure and drain requirements before installation.
Installation should be performed by a licensed plumber in accordance with local plumbing codes and applicable IPC requirements. Shut off the supply line and relieve pressure before making any connections. The unit requires a solid, level mounting surface such as a concrete pad, and anchor hardware should be sized to the substrate. Do not overtighten tamper-resistant fasteners beyond hardware manufacturer specifications, and verify drain clearance before final anchor placement.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!