

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 280 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LK4430BF1UFRKGRY is a tri-level pedestal bottle filling station engineered for high-traffic outdoor environments. The unit houses three separate filling stations on a single pedestal, providing simultaneous access without electrical power — the system is non-refrigerated and non-filtered. Activation is mechanical via a front bubbler button, and a laminar flow design reduces splashing during use. The station is built from heavy-duty 316 stainless steel and finished with a durable powder coat, offering both corrosion resistance and long-term structural integrity in exposed outdoor conditions. Fully sealed, freeze-resistant valves protect the supply line against cold-weather damage and prevent groundwater contamination from mixing with potable water. The unit meets NSF 372 standards for lead-free compliance.
This station is intended for permanent outdoor installation in educational campuses, public parks, recreational facilities, and similar high-use settings. Its tri-level configuration accommodates users of varying heights, making it appropriate for school grounds and ADA-conscious site layouts. The vandal-resistant bubbler design with chrome-plated hood guards addresses the durability demands of unsupervised public spaces. With no electrical infrastructure required, the station can be placed wherever a potable water supply line is accessible, simplifying site planning for facility managers and plumbing contractors.
Designed as an OEM-style outdoor pedestal bottle filling station for permanent plumbing tie-in to a potable cold water supply line in outdoor or semi-outdoor installations.
Installation should be performed by a licensed plumber in accordance with local plumbing codes and the applicable IPC requirements for drinking water fixtures. Shut off the potable water supply to the feed line before making any connections. The unit requires a dedicated cold water supply rough-in and a drain connection; verify that the drain line is properly separated from any non-potable drainage as required by code. Do not use the station as a structural support, and confirm that the mounting substrate is rated for the unit weight prior to final anchoring.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!