

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 215 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LK4430BF1MBLK is a tri-level outdoor bottle filling station engineered for high-traffic, non-refrigerated, non-filtered applications. Built from heavy-gauge 316 stainless steel, this unit delivers corrosion resistance and long service life in demanding outdoor environments. Three simultaneous fill stations share a single floor-mount pedestal, making it well suited for locations where throughput matters. The mechanical activation system requires no electrical connection, eliminating wiring costs and energy draw entirely. Chrome-plated bubblers include an integral hood guard to reduce contamination from airborne particulates. Lead-free materials comply with NSF 372 standards for safe drinking water delivery. A licensed plumber installs this unit during new construction or renovation.
This filling station is intended for outdoor installation at educational institutions, parks, recreational facilities, and other high-traffic public areas. The floor-mount base provides a secure, stable footprint suitable for concrete or other hard surfaces exposed to the elements. The black finish offers a neutral, contemporary appearance that integrates into a wide range of site aesthetics. No electrical infrastructure is required at the installation point, simplifying project coordination between trades. Tamper-resistant screws and vandal-resistant construction support long-term serviceability in unsupervised settings.
Designed as a floor-mounted outdoor bottle filling station for new construction and retrofit installations at sites requiring a non-refrigerated, non-filtered multi-station hydration solution.
Installation should be performed by a licensed plumber in accordance with applicable local plumbing codes and the International Plumbing Code (IPC). Shut off the water supply to the feed line before making any connections. The unit requires a floor-mount anchor detail appropriate to the substrate — verify surface load capacity before anchoring. No electrical rough-in is required for this model.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!