

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 215 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LK4430BF1LBLU is a tri-level, non-refrigerated outdoor bottle filling station built for high-traffic public installations. Constructed from heavy-duty type-316 stainless steel with a powder-coated exterior, the unit is engineered to withstand outdoor exposure, vandalism, and continuous use. Three accessible stations operate independently using mechanical buttons — one bottle filler button and one front bubbler button per position — requiring no electrical connection. Chrome-plated bubblers with integral hood guards protect against contamination, airborne deposits, and tampering. A laminar flow design reduces splashing for fast, clean refills. Lead-reduction features are incorporated to support safe drinking water delivery. Licensed plumbers install this floor-mounted unit in parks, campuses, and recreational facilities.
This station is designed for permanent outdoor installation in parks, educational campuses, recreational facilities, and other public spaces. Its tri-level configuration accommodates users of varying heights, including ADA-accessible positioning. The non-refrigerated design eliminates electrical requirements, simplifying installation in locations where power access is limited or cost-prohibitive. The unit promotes reusable bottle use and helps reduce single-use plastic consumption in high-foot-traffic environments. Its stainless steel and powder-coated construction holds up to weather extremes and institutional-level daily use.
Designed as an OEM-style floor-mounted outdoor bottle filling station suitable for permanent installation in parks, campuses, and recreational facilities where a non-refrigerated, vandal-resistant tri-level hydration unit is required.
Installation should be performed by a licensed plumber in accordance with local plumbing codes and applicable IPC requirements. Shut off the water supply to the feed line before beginning any connections. Floor mounting requires secure anchoring to a stable concrete or structural surface per local building requirements. Do not pressurize the unit until all supply and drain connections have been fully completed and inspected.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!