

Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 176 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED LK4420BF1LFRKGRY is a bi-level outdoor pedestal drinking water station combining a bottle filler and two bubblers in a single, non-refrigerated unit. Fabricated from heavy-gauge 316 stainless steel, the station resists corrosion and vandalism in high-traffic outdoor environments. Both bubblers include chrome-plated integral hood guards that reduce contamination from airborne deposits and tampering. A fully sealed, freeze-resistant structure protects internal components from freezing temperatures and groundwater intrusion. Laminar flow technology at the bottle filler port delivers a smooth, low-splash fill stream. Mechanical activation controls both the bubbler and bottle filler, requiring no electrical connection for operation. Licensed plumbers install this unit in compliance with applicable local codes.
The LK4420BF1LFRKGRY is suited for outdoor installations at parks, university campuses, recreational facilities, and other public or institutional spaces where electrical service to a chiller is unavailable or impractical. The bi-level pedestal design accommodates users of varying heights. Because no refrigeration or electrical hookup is required, placement flexibility is significantly greater than chilled fountain units. The gray finish indicated in the part number is one of twelve available factory color options for this model family.
Designed as an OEM-style outdoor pedestal bottle filling and drinking fountain station for non-refrigerated potable water supply systems in public, institutional, and recreational applications.
Installation should be performed by a licensed plumber in accordance with applicable local plumbing codes and ANSI/ASME A112 standards. Shut off the potable water supply and depressurize the line before making any connections. Anchor the pedestal base per the manufacturer mounting instructions before connecting to the supply line. No electrical rough-in is required for this non-refrigerated model.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!