

Ships via freight in 1-3 business days
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
This product weighs 84 lb each and will be shipped via LTL carrier. A lift gate option will be added free of charge for your convenience.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BSC PREFERRED EZSTL8WSSK is a bi-level, ADA-compliant water cooler and touchless bottle filling station designed for high-traffic indoor installations. The unit delivers a chilling capacity of 8.0 gallons per hour and a bottle fill rate of 1.1 gallons per minute, making it suited to demanding environments where throughput matters. Stainless steel construction incorporates antimicrobial protection to inhibit mold and mildew growth. A laminar flow nozzle provides a splash-free fill arc, and the real drain system eliminates standing water at the basin. The unit is certified lead-free to NSF 372 and meets ADA compliance requirements for accessible height and reach range. Licensed plumbers or qualified facilities technicians handle installation under applicable plumbing codes.
The EZSTL8WSSK is intended for permanent indoor installation in schools, office buildings, gyms, healthcare facilities, and other public or semi-public spaces where simultaneous cooler and bottle-filling service is needed. The bi-level configuration places a Flexi-Guard Safety Bubbler with push-bar activation at the lower ADA-accessible height and a touchless electronic bottle filler at the upper position. The unit accommodates both standard and reversed high-left/low-right plumbing rough-in configurations, providing layout flexibility during construction or renovation. An integrated Green Ticker display counts the cumulative number of single-use plastic bottles displaced by refills, supporting sustainability tracking for facility reporting.
Designed as an OEM-style permanent installation unit for indoor plumbed water supply lines. Supports both standard and reversed high-left/low-right rough-in configurations to fit varied spatial layouts.
Installation requires a licensed plumber and must comply with applicable local plumbing codes and IPC requirements. Shut off the building water supply to the rough-in line before beginning connection work. The unit requires a dedicated drain connection; verify drain location aligns with the selected high-left/low-right or reversed configuration before final positioning. Do not energize the refrigeration circuit until all water connections are complete, tested for leaks, and the unit has been allowed to reach thermal equilibrium.
We pulled together the parts most installs need for this unit, plus a few add-ons worth a look. Check what you need — nothing here blocks checkout.
Add install kit to cart
—
Thanks for subscribing!
This email has been registered!