

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BRADLEY S19314PDCFW is a combination drench shower and eye-face wash station designed for emergency decontamination in industrial and commercial environments. The unit features a plastic bowl with a hinged dust cover, a push-plate-activated eyewash, and a plastic shower head. The galvanized steel pipe construction provides corrosion resistance suited to harsh facility conditions. The shower head delivers 22 gallons per minute at 30 psi, meeting ANSI Z358.1 emergency equipment requirements. The floor-mount design stands 94.13 inches overall height and spans 26.81 inches in overall length, making it suitable for permanent installation in chemical handling areas, laboratories, and industrial facilities.
This station is intended for facilities where workers may be exposed to hazardous chemicals, irritants, or corrosive substances. It serves as a primary emergency response fixture in manufacturing plants, laboratories, maintenance shops, and industrial processing areas. The combination drench-shower and eye-face-wash design means a single station covers full-body and face-eye decontamination. Installation is performed by licensed plumbers in coordination with facility safety requirements. The yellow color provides high visibility in emergency situations.
Designed as an OEM-style floor-mount emergency safety station for permanent plumbed installation in industrial, commercial, and laboratory facilities requiring ANSI Z358.1-compliant drench shower and eye-face wash coverage.
Installation must be performed by a licensed plumber in accordance with applicable plumbing codes and ANSI Z358.1 placement requirements, which specify maximum travel distances from hazard areas. Shut off the water supply to the feed line before making connections. Verify the supply line can sustain the required flow rate and pressure at the station inlet before commissioning. Do not obstruct access to the unit with equipment, storage, or signage after installation.
Thanks for subscribing!
This email has been registered!