

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BRADLEY S19314GG is a combination drench shower and eye and face wash station designed for emergency safety response in industrial and commercial environments. It delivers 26 gallons per minute (GPM) of shower flow at 30 psi operating pressure through a plastic shower head measuring 3.1 inches in diameter. The unit is constructed with galvanized steel pipe for corrosion resistance and mounts to the floor for a permanent, stable installation. Activation is handled via a push flag mechanism, allowing fast one-motion operation in an emergency. The station ships without a bowl and accepts top or mid supply connections through a 1-1/4 inch inlet. Licensed safety professionals and facility maintenance crews are the typical installers.
This station is suited for manufacturing facilities, chemical handling areas, laboratories, and other industrial workplaces where ANSI Z358.1-2009 emergency eyewash and shower compliance is required. The floor-mount configuration makes it appropriate for open floor areas where wall mounting is not practical. The yellow color finish aids visibility, which is critical for fast emergency access. The push flag activation requires minimal force and can be operated by an injured or disoriented worker. The 1-1/4 inch inlet supports the high flow rate necessary to meet drench shower standards.
Designed as an OEM-style floor-mounted combination drench shower and eye and face wash station for industrial and commercial safety installations requiring ANSI Z358.1-2009 compliance.
Installation is typically performed by a licensed plumber in accordance with applicable local plumbing codes and ANSI Z358.1-2009 requirements. Shut off the water supply to the branch line before making any connections. Ensure the supply line is adequately sized to sustain the 26 GPM flow rate without pressure drop below the minimum required activation pressure. The station must be installed within the travel distance specified by ANSI Z358.1-2009 from identified hazard areas, and the area in front of the unit must remain unobstructed at all times.
Thanks for subscribing!
This email has been registered!