

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BRADLEY S19314BF is a combination drench shower and eye/face wash station designed for emergency safety response in industrial, commercial, and laboratory environments. The unit delivers 26 GPM of shower flow and 3 GPM of bowl flow simultaneously at 30 psi, providing full-body and facial decontamination from a single floor-mounted assembly. Activation is handled by a triangular pull rod with push flag mechanism, allowing rapid single-motion deployment. The galvanized steel pipe construction and stainless steel bowl are built for durability in demanding work environments. A plastic shower head with 3.1-inch diameter completes the overhead delivery. Licensed safety professionals and facility maintenance crews are the typical installers.
This station is intended for facilities where workers are exposed to hazardous chemicals, corrosive materials, or biological agents requiring immediate emergency flushing. Floor mount installation suits manufacturing floors, chemical processing areas, laboratories, and similar industrial settings. The 1-1/4 inch inlet accommodates top or mid supply connections, offering flexibility during rough-in. The open bowl style and 13-inch bowl diameter allow unrestricted eye and face flushing. Overall installed height reaches 94.13 inches, and the unit extends 26.81 inches in length, making clearance planning essential during layout.
Designed as an OEM-style floor-mounted drench shower and eye/face wash combination station with a 1-1/4 inch supply inlet, compatible with standard plumbing supply configurations supporting top or mid supply connections.
Installation should be performed by a licensed plumber in accordance with applicable local plumbing codes and ANSI Z358.1-2009 positioning requirements, which govern accessible location, clearance zones, and response travel distance. Shut off the water supply and depressurize the line before making any inlet connections. Verify adequate flow rate and pressure at the supply point prior to final connection, as undersized supply lines will prevent the unit from meeting rated flow performance. Do not obstruct the activation rod or the area around the station after installation.
Thanks for subscribing!
This email has been registered!