

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The BRADLEY S19214FW is a pedestal-mounted emergency eye and face wash station designed for fixed installation in facilities where chemical splash or eye hazard exposure is a concern. The unit features an open plastic bowl and is activated via a push-flag mechanism, allowing rapid hands-free operation during an emergency. Flow is delivered at up to 3.0 GPM through a 1/2-inch inlet connection at a rated pressure of 30 psi. At 42 pounds, this is a substantial, floor-standing unit built to meet ANSI Z358.1-2009 compliance requirements for emergency eyewash equipment. Installation is handled by licensed plumbers or qualified safety equipment contractors.
This eye and face wash station is suited for industrial, commercial, and institutional environments where OSHA-mandated emergency eyewash access is required near hazardous materials or chemical handling areas. Typical installations include manufacturing floors, laboratories, chemical storage rooms, and maintenance areas. The pedestal mount configuration makes it appropriate for open floor areas where wall or deck mounting is not feasible. The push-flag activation allows immediate, tool-free actuation, which is critical in an emergency scenario where the user may have limited visibility or hand control.
Designed as an OEM-style pedestal-mount emergency eye and face wash station for use in facilities requiring ANSI Z358.1-2009 compliant emergency eyewash equipment.
Installation should be performed by a licensed plumber in accordance with applicable local plumbing codes and ANSI Z358.1-2009 placement requirements, which specify that the unit must be located within 10 seconds of travel from the hazard area. Shut off the water supply to the branch line before making connections. Flush the supply line before final connection to remove debris that could obstruct the wash heads. Verify final flow rate and activation function after installation and before commissioning.
Thanks for subscribing!
This email has been registered!