

Ships same day if ordered by 12 pm
Manufacturer pricing rules prevent us from advertising our discount — no account or email required to see it.
Secure Payments
Easy Returns
Expert Advice
Fast Shipping
The ATKORE 59745 is a Schedule 40 PVC conduit elbow rated for 90-degree turns in electrical raceway systems. It features a special radius bend and plain ends for solvent-weld connections to compatible PVC conduit and fittings. With a 4-inch trade size and an outside diameter of 4.5 inches, this elbow is built for large-diameter conduit runs in commercial and industrial electrical installations. The gray PVC construction resists moisture, corrosion, and many common chemicals, making it well suited for underground, direct-burial, and exposed applications where metallic conduit is not preferred. Listed to UL 651, it meets the standard requirements for Schedule 40 rigid PVC conduit fittings. Licensed electricians and electrical contractors handle installation.
This elbow is used in electrical distribution and branch-circuit conduit systems requiring a 90-degree direction change in a 4-inch trade-size PVC raceway. The special radius design accommodates wire-pull requirements in runs where a standard or long-radius elbow is specified. Typical applications include service entrance raceways, underground feeder runs, utility infrastructure, and large commercial or industrial wiring systems. The plain-end configuration accepts standard solvent-cement joining to Schedule 40 PVC conduit and couplings. Manufactured in the United States, this fitting is sourced from Allied Tube and Conduit, a brand under the ATKORE family.
Designed as an OEM-style fitting for use with 4-inch trade size Schedule 40 rigid PVC conduit systems joined by solvent cement. Listed to UL 651 for use in permitted PVC conduit applications per applicable electrical code.
Installation should be performed by a licensed electrician in accordance with the National Electrical Code (NEC) and applicable local codes. De-energize all circuits in the affected raceway before pulling conductors or making connections. Use listed PVC solvent cement and primer appropriate for the pipe schedule and ambient temperature range. Do not use this fitting with metallic conduit systems or where the application requires fittings rated beyond the UL 651 standard.
Thanks for subscribing!
This email has been registered!