{"product_id":"modine-5h75465-long-lead-hot-surface-ignitor","title":"Modine 5H75465 Long Lead Hot Surface Ignitor","description":"\u003ch3\u003eProduct Description\u003c\/h3\u003e\n\u003cp\u003eThe Modine 5H75465 is a Long Lead Hot Surface Ignitor, an official OEM component specifically designed for Modine HVAC equipment. Manufactured in the United States, this ignitor is a critical part of ignition systems, ensuring efficient heating and durability. It falls under the category of Ignition Systems and Components.\u003c\/p\u003e\n\u003cul\u003e\n  \u003cli\u003eLong lead design for versatile installation in HVAC systems.\u003c\/li\u003e\n  \u003cli\u003eOfficial OEM part for Modine HVAC equipment, ensuring compatibility and performance.\u003c\/li\u003e\n  \u003cli\u003eFunctions as a critical component in ignition systems for efficient heating.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eProduct Highlights\u003c\/h4\u003e\n\u003cp\u003eHigh-performance hot surface ignitor for HVAC systems, ensuring efficient heating and durability.\u003c\/p\u003e\n\u003ch3\u003eProduct Information\u003c\/h3\u003e\n\u003ch4\u003eStandard Information\u003c\/h4\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBrand\u003c\/strong\u003e: MODINE\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eManufacturer Part Number\u003c\/strong\u003e: 5H75465\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCountry of Origin\u003c\/strong\u003e: United States\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch4\u003eTechnical Specifications\u003c\/h4\u003e\n\u003cul\u003e\n  \u003cli\u003e\n\u003cstrong\u003eASIN\u003c\/strong\u003e: B00QW2PL0O\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eBrand\u003c\/strong\u003e: Modine\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProduct Type\u003c\/strong\u003e: Ignitor\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProduct Group\u003c\/strong\u003e: BISS\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eMPN\u003c\/strong\u003e: 5H75465\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCountry of Origin\u003c\/strong\u003e: United States\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCategory\u003c\/strong\u003e: Ignition Systems and Components\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eCondition\u003c\/strong\u003e: New\u003c\/li\u003e\n  \u003cli\u003e\n\u003cstrong\u003eProduct ID\u003c\/strong\u003e: 19382886\u003c\/li\u003e\n\u003c\/ul\u003e\n","brand":"MODINE","offers":[{"title":"Default Title","offer_id":51306584015154,"sku":"5H75465","price":111.92,"currency_code":"USD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0270\/4519\/9983\/files\/309546598.jpg?v=1781292450","url":"https:\/\/voomisupply.com\/products\/modine-5h75465-long-lead-hot-surface-ignitor","provider":"Voomi Supply","version":"1.0","type":"link"}